CENTRAL STATION SERIES Solar Station SCS500 - SCS660 - SCS1000

tescom-central-station.jpg
tescom-central-station.jpg

CENTRAL STATION SERIES Solar Station SCS500 - SCS660 - SCS1000

0.00

FEATURES
• "Plug & Play" solution with excellent, safe and high performance
• MV traf and cabinet for mounting Betonda outdoors
• High productivity thanks to direct connection to MV distribution network without LV
trafic • Measured AC transformer switchboard
• No air conditioning system required


OPTIONS
• Large MT distribution system that can be configured to mount solar parks
• MT transformers for voltages outside 20 Kv
How to increase the total efficiency of a conversion system and how to cut installation costs? This can be achieved using a Sirio Central Station (SCS) system with Sirio Central HV-MT inverters connected to a common medium voltage transformer. The devices are installed in concrete plants to extend the service life, increase thermal insulation, provide resistance to airborne materials and the most adverse environmental conditions.

Complementary system for large installations
The Sirio Central Station system has models that provide a perfect, safe and high performance "Plug & Play" solution from 200 kW to 1 MW. The modular system using inverters in separate substations, each with its own MV / LV transformer, allows the inverters to be positioned in the photovoltaic field in a bi-static position to make the installation suitable. The rationale for having separate power plants is to cut down the production losses that are caused by failures, during normal and extraordinary maintenance work. The plants were constructed in accordance with the CEI.0-16 standards currently in effect for vibratory ferrous masonry, in accordance with the Enel Distribuzione Power Transmission Network Connection Guide dated December 1, 2008 and the Enel DG 2092 Construction Specification dated 1 December 2008. Structures are particularly resistant to airborne materials as they are treated with special plastic and waterproof coatings that protect against cracks and leaks. The outer walls are covered with a quartz / plastic paint with a woven coating to provide the highest resistance to airborne materials even at sea, on mountains, in industry or in very dirty environments. The normal operating conditions of the installed equipment are guaranteed by using air vents with natural ventilation, thus preventing the return to the air conditioning systems. In accordance with the CEI EN 62271-202 standard, the entire plant is fitted with electromechanical equipment from start to finish and, where appropriate, the electrical equipment is ready to be placed in place for subsequent start-up. especially resistant to airborne substances. The outer walls are covered with a quartz / plastic paint with a woven coating to provide the highest resistance to airborne materials even at sea, on mountains, in industry or in very dirty environments. The normal operating conditions of the installed equipment are guaranteed by using air vents with natural ventilation, thus preventing the return to the air conditioning systems. In accordance with the CEI EN 62271-202 standard, the entire plant is fitted with electromechanical equipment from start to finish and, where appropriate, the electrical equipment is ready to be placed in place for subsequent start-up. especially resistant to airborne substances. The outer walls are covered with a quartz / plastic paint with a woven coating to provide the highest resistance to airborne materials even at sea, on mountains, in industry or in very dirty environments. The normal operating conditions of the installed equipment are guaranteed by using air vents with natural ventilation, thus preventing the return to the air conditioning systems. In accordance with the CEI EN 62271-202 standard, the entire plant is fitted with electromechanical equipment from start to finish and, where appropriate, the electrical equipment is ready to be placed in place for subsequent start-up. The normal operating conditions of the installed equipment are guaranteed by using air vents with natural ventilation, thus preventing the return to the air conditioning systems. In accordance with the CEI EN 62271-202 standard, the entire plant is fitted with electromechanical equipment from start to finish and, where appropriate, the electrical equipment is ready to be placed in place for subsequent start-up. The normal operating conditions of the installed equipment are guaranteed by using air vents with natural ventilation, thus preventing the return to the air conditioning systems. In accordance with the CEI EN 62271-202 standard, the entire plant is fitted with electromechanical equipment from start to finish and, where appropriate, the electrical equipment is ready to be placed in place for subsequent start-up.

Optional solutions At the
same time, Aros can offer pre-assembled solutions for:
- CEI 0-16 standards and user facilities with general device protection,
- Public utility booths with measurement unit readings of values ​​of the electricity distribution system,
- 200 depending on the models in the catalog Intermediate configurations are available from KW,
- In- shelf application.

Practical and perfect
The SCS provides solutions that can be defined as "all in one" because it reduces the normal design phases, shortens transport and assembly times, and the system comes pre-equipped with everything you need to get started. Sirio Central Station makes the system an attractive option for bringing the best return on investment (ROI), because of the low cost at significant times, the excellent efficiency of the entire system (due to the inverter and transformer used) and the time savings in startup stages.

Add To Cart